Construction Partners: Designer:
Thomas Heatherwick
Structural engineers:
SKM Anthony Hunts
Manufacturer:
Littlehampton Welding Factory
Design:
Packman Lucas
Hydraulics:
Primary Fluid Power, Knowsley
Hydraulics:
DJW Consulting
Hydraulics:
Solent Fluid Power
Planning Consultant:
Montagu Evans
Concept Consultant:
Ron Packman
Build Information: Technical Information: The bridge is formed of 8 triangular sections and is 12m long when extended. |
||||||||||
Visited by: Stewart Marchant, 14/07/2005
Present Condition: Good -operational
|
||||||||||
|
||||||||||