Lift bridge animation
Movable Bridges in the British Isles
Swing bridge animation
Kirk Lane swing bridge - 2nd  - New Junction Canal
Previous Bridges on this site :
     1902 - Kirk Lane swing bridge 1st
Back to
search page
Address: Sykehouse
County: Yorkshire
Country: England
OS Grid Ref: SE640165
Guide:
     Nicholsons Guide to the Waterways
     Volume 6, page 114 © 1997 Collins
Type: Swing
Built: c.1980
Construction: steel
Power: Electric
Use: Road
Customer:
Feedback
If you have any further information about this bridge or believe that the details displayed are incorrect please let us know via our feedback form. Please click here
Kirk Lane swing bridge viewed from the south-east
Kirk Lane swing bridge viewed from the south-east
Build Information:
Technical Information:
Visited by: Chris Thompson & Stewart Marchant, 26 and 28/04/2008
Present Condition: Good -operational
General notes:
The current bridge is a modern steel structure, with full electrical controls and drive mechanism.

While Chris was photographing Kirk Lane bridge he noticed that Sykehouse bridge was being opened - but it was a bit too far to get along the towpath in time to photgraph it - even on his bike!

The record book of the New Junction Canal (inspected in Waterways Trust Archive, Gloucester - archive ref 93/386) notes that A. Robbins visited the works of J. Butler & Co on 20/08/1902 to inspect patterns for frames, roller paths, centre pivot and pintle for the original swing bridges. He visited the works again on 12/11/02 to inspect progress on the swing bridge for Kirk Lane. Robbins reported that the short arm of the bridge was 23' 11 7/8" and the long arm 48' 5", giving a total of 73' 1 7/8" instead of 73' 1 3/4 " - 1/8" too long!

John Powell reports that the new swing bridge was constructed in 1977 by Wellmen Brothers Contractor and designed and supervised by Husband & Company Consulting Engineers. The Tender Sum was 97,499.00.

It comprises two main longitudinal steel plate girders with steel transverse beams and a decking of longitudinal aluminium planks coated with an epoxy resin anti-skid surfacing. The bridge is powered by an electro-hydraulic system to operate the wedging and slewing mechanisms on an automatic basis. The bridge was originally fitted with manual swing arm barriers but these have been replaced with fully automatic drop-arm road barriers and wig-wag road signals.

The bridges were originally under the sole control of a resident bridge keeper but subsequently a standard contol console has been built so that the bridge can be operated by the boater.
Acknowledgements :   John Powell 
Related Website :    
Bibliography :  
Back to Top
Database ref number: 492